Application:
Recommended for the suspension of stationary pipe lines.
Installation:
Hanger load nut above clevis must be tightened securely to assure proper hanger performance.
Adjustment:
Vertical adjustment without removing pipe may be made from 3/8″ through 5-1/8″, varying with the size of clevis. Tighten upper nut after adjustment.
Features:
• Design has yoke on outside of lower U-strap so yoke cannot slide toward center of bolt, thus bending of bolt is minimized.
• Sizes 5″ and up have rod and two nuts instead of bolt and nut; thread length on clevis rod is such that the thread locks the nuts in place, and threads are not in shear plane.